Category: Aerospace & Defense RF Testing

Ground laboratory RF test paths, instrumentation and component requirements for aerospace and defense engineers.


  • Before Enabling RF on an Aerospace Ground-Test Bench

    Before Enabling RF on an Aerospace Ground-Test Bench

    Before enabling RF, confirm the ground-test route, source state, terminations and…

  • Correlating Aerospace RF Benches Across Laboratories

    Correlating Aerospace RF Benches Across Laboratories

    Correlate aerospace RF benches using defined waveforms, reference planes and stable…

  • Long Aerospace RF Tests: Watch Passive-Path Drift

    Long Aerospace RF Tests: Watch Passive-Path Drift

    Long aerospace RF tests need a plan for detecting meaningful passive-path…

  • Aerospace Receiver Input Level: Correct for the Complete Stimulus Path

    Aerospace Receiver Input Level: Correct for the Complete Stimulus Path

    A receiver’s input level must account for the complete aerospace stimulus…

  • Unused Divider Ports in Aerospace RF Tests

    Unused Divider Ports in Aerospace RF Tests

    Treat unused divider ports according to the model documentation and test…

  • Aerospace RF Accessory Spares: Define Equivalent Replacement

    Aerospace RF Accessory Spares: Define Equivalent Replacement

    Define equivalent RF accessory replacements by documented requirements and measured configuration,…

  • Multiple RF Sources in an Aerospace Bench: Total Power and Isolation

    Multiple RF Sources in an Aerospace Bench: Total Power and Isolation

    A multi-source aerospace bench needs checks for total power and source-to-source…

  • Frequency-Agile Aerospace Communication Tests: Check the Entire Span

    Frequency-Agile Aerospace Communication Tests: Check the Entire Span

    A frequency-agile communication test needs passive hardware rated across every selected…

  • DC Resistance Versus RF Performance in Aerospace Test Fixtures

    DC Resistance Versus RF Performance in Aerospace Test Fixtures

    DC resistance is only one property of an RF resistor fixture.

  • Aerospace Pulse Duty-Cycle Calculations for Test Planning

    Aerospace Pulse Duty-Cycle Calculations for Test Planning

    Pulse duty-cycle calculations estimate average loading under stated waveform assumptions.