
Testing RF Board Assemblies Before Final Enclosure Integration
RF board tests need defined reference points, power supplies and bias…

Writing Measurable RF Production Test Requirements
An RF accessory purchasing specification should state measurable requirements, operating conditions…

How to Use a Power Divider in a Manufacturing Test Station
A power divider can route a stimulus to multiple paths, provided…

Validating a Substitute RF Measurement Route in Production
Qualifying an attenuator substitute requires checking electrical, thermal and mechanical performance…

Why Manufacturing RF Stations Need Configuration Control
Configuration control keeps station hardware, software, correction data and procedures linked…

Transferring an RF Test Method to a Contract Manufacturer
Contract manufacturers should specify RF accessories from the customer’s test requirements,…

How to Investigate RF Power Drift During a Factory Shift
RF power drift during a shift may originate from the device,…

What Is First-Pass Yield in RF Testing?
First-pass yield is the proportion of units that meet the defined…

How to Reduce Connector Damage in RF Test Stations
RF connector damage can be reduced by controlling alignment, mating force,…

What Is RF Fixture De-Embedding in Manufacturing?
De-embedding mathematically removes a characterized fixture response to estimate performance at…
